Camp building under construction.
Millrace - rock construction, east end dam.
Civilian Conservation Corp, Poinsett State Park
View of spillway at dam, lower end.
Bathhouse under construction.
Waste bank on road slope and park boundary line, for proposed Project 702-A.
Waste bank on county road slope and park boundary line, for proposed project 702-A.
Bathhouse and lodge, from across lake, Project 108.
Overnight cabin, being stained, Project 107-B.
Single shrub of mountain laurel in bloom on trail side; relative size shown by man standing at left.
Close-up showing clusters of bloom on some mountain laurel in picture #111.
Attention wildlife large lizard on tree trunk.
Incinerator near picnic shelter.
Grouted rubble gutters of choquina rock being placed in park road ditches on steep grades to prevent wash, Project 409-B (706).
Grouted rubble gutters of choquina rock being placed in park road ditches on steep grades to prevent wash by concentrated water in ditches; gutter empties into V headwall at the bottom of the picture, Project 409-B.
Landscaping above retaining wall, rear of caretaker's house, Project 706.
School children from Wedgefield bathing in lake.
Parking area near bathhouse.