search scera
browse scera Up

State Parks 3


View Gallery

Title
Description
Date

Outdoor fireplace in picnic area.

1937-05-01

Maintenance.

1937-05-01

Guardrails around parking area at picnic grounds with close up view (Job 32).

1937-06-28

Cabins overnight view looking at north side of cabin no. 3 (Job 7 (107).

1937-08-10

Firebox completed and equipped with fire-fighting tools (Job 31 (156)).

1937-08-10

Outdoor fireplaces at public campground (Job 32 (145)).

1937-08-21

Outdoor fireplaces at public campground (Job 27 (148)).

1937-08-21

Trailside shelter completed (Job 9 (118)).

1937-08-21

Furniture, cabins, chairs, tables, and three-quarter bed (Job 51 (CCC-157)).

1938-03-01

Furniture (Job 51 (CCC-157)).

1938-03-01

Furniture - cabin, double bed (Job 51 (CCC-157)).

1938-03-01

Latrine and toilet, outdoor fireplace, fire circle, view of camp fire circle (Job 27).

1938-03-10

View of large spillway at dam, dam height 13 feet, length 650 feet; area of lake 10.4 acres, spring feed by Shank's Creek.

1938-03-25

The campfire circle at the public campground, a dogwood tree in the background in full bloom (see also 2 photos of spillway in larger format).

1938-03-25

Civilian Conservation Corp, Poinsett State Park

Civilian Conservation Corp, Poinsett State Park

Camp building under construction.

Supervisory personnel.

Unidentified.

Millrace - rock construction, east end dam.

1935-04-02

Civilian Conservation Corp, Poinsett State Park

1935-05-01

Unidentified.

Unidentified.

Unidentified.

Powered by Preservica
History and Heritage for all Generations