search scera
browse scera Up

State Parks 11


View Gallery

Title
Description
Date

Sawmill in operation (1012) (Job 5).

1939-04-06

View of lumber yard (1012) (Job 5).

1939-04-06

Planter shed under construction, with view of lumber yard in the background (1012) (Job 5).

1939-04-06

Repair shop and storage building (120) (Job 9).

1939-04-06

Repair shop and storage building; storage building built of lumber sawed under Job 5 (120) (Job 5).

1939-04-06

Landing dock and piers, view of boat basin (162) (Job 14).

1939-04-06

Landing docks and piers, view of hill before excavation work was started (162) (Job 14).

1939-04-06

Landing docks and piers, 3/8 yard Hanson shovel at work on excavation for boat basin (162) (Job 14).

1939-04-06

Road sloping (county road), banks on county road sloped and sodded with Bermuda grass (303) (Job 7).

1939-08-21

Road sloping (county road) (303) (Job 7); moving and planting trees and shrubs (country road), view of bank on county road after it had been sloped and planted (706) (Job 12).

1939-08-21

Landing docks and piers, view of boat basin from observation point (162) (Job 14).

1939-08-21

Entrance road (Negro area), clearing for the entrance road (Negro area) (202) (Job 22).

1939-08-21

Clearing reservoir, view showing trees along riverbank in lake basin; this job cancelled because Greenwood County had trees cut by private contractor (401) (Job 24).

1939-08-21

Clearing reservoir, view showing trees along riverbank in lake basin; this job cancelled because Greenwood County had trees cut by a private contractor (401) (Job 24).

1939-08-21

Clearing reservoir, view showing trees along bank in lake basin, taken from boat basin; this job cancelled because Greenwood County had trees cut by a private contractor (401) (Job 24).

1939-08-21

Bank sloping (county road), bank sloping on county road, north of entrance to Negro area (303) (Job 7).

1939-11-01

Landing docks and piers, view showing form work on front wall at boat basin (162) (Job 14).

1939-11-01

Landing docks and piers, excavation work for steps on east side of boat basin (162) (Job 14).

1939-11-01

Landing docks and piers, view of boat basin from observation point (162) (Job 14).

1939-11-01

Picnic shelter (White area), picnic shelter under construction (119) (Job 15).

1939-11-01

Picnic shelter (Negro area), foundation poured for picnic shelter (119) (Job 17).

1939-11-01

Seawge and waste disposal system (White area), excavation for disposal bed (139) (Job 20).

1939-11-01

Entrance road (Negro area), entrance road built, banks sloped and road ready for top soil and crushed stone (202) (Job 22).

1939-11-01

Entrance road, circle, and parking areas (White area), road laid out ready to start cut and fill (202) (Job 25).

1939-11-01

Powered by Preservica
History and Heritage for all Generations